What is Wichel Way?
It is the fourth road into Wichelstowe, running beneath the M4 just east of junction 16. Swindon Borough Council calls the project the Wichelstowe southern access scheme. The road connects, through Wichelstowe, Hay Lane and Wharf Road south of the motorway with Redposts Drive to the north and Croft Road to the east. A new roundabout south of the M4 joins it to Hay Lane and Wharf Road.
The council stresses what it is not: "not a relief road". It is a two-way single carriageway whose main purpose is access to Wichelstowe, although it does divert some traffic away from junction 16.
Is Wichel Way open?
Yes. Swindon Borough Council announced that it opened to drivers on the morning of 26 October 2026: see Swindo's report of the opening. The council's scheme page, when we read it on 20 November 2026, had not been updated: it still described its own work as "almost complete", with the developers of Wichelstowe responsible for finishing Wichel Way and connecting it to the rest of the development.
Why was it built?
The road was a condition of the planning permission for Wichelstowe. The council says it supports:
- 4,500 new homes
- a new district centre
- 12.5 hectares of employment land
- around 2,000 new jobs
Who paid for it?
| Source |
Amount |
| Department for Transport, through the Swindon and Wiltshire Local Enterprise Partnership |
£22.9 million |
| Swindon Borough Council |
£5.8 million |
The contractor for detailed design and construction was Alun Griffiths Ltd.
Why an underpass and not a bridge?
Because the M4 sits higher than the fields either side at that point. The council says going under caused less disruption than raising the approach road and bridging the motorway, and the underpass was built in phases so that M4 traffic kept moving. It has published a video of how it was done.
Can I walk or cycle through it?
Yes. A walking and cycling route runs through the underpass between Wharf Road and Hay Lane, which means people on foot or bike can cross the M4 without going near junction 16.
The council's questions and answers also say a canal culvert will be built under the realigned section of Wharf Road, for the Wiltshire and Berkshire Canal Trust to complete and connect at a later date.
What was done for wildlife?
The council's figures for animals moved to a specially created habitat west of the site before construction:
- 670 slow-worms
- 559 toads
- 40 great crested newts
- 13 grass snakes
The scheme also includes four new ecology ponds, two wildlife underpasses for badgers, amphibians, reptiles, water voles and otters, tree-canopy crossings for bats, bat roost boxes, wildlife kerbs and wildlife-sensitive lighting. Swindo has also reported on hedgehog warning signs on Wichel Way.
More from Swindo: Wichelstowe, M4 junction 16, future transport plans for Swindon.
Sources: Swindon Borough Council, Wichelstowe southern access scheme, Swindon Borough Council, Wichelstowe southern access questions and answers, Swindon Borough Council, new road linking Wichelstowe to the M4 now open. Checked 20 November 2026.
Spot something wrong? Suggest a correction