Future Transport Plans for Swindon

Swindon Borough Council's current transport plans include finishing the Southern Connector Road for the New Eastern Villages, a new access from the A420 at Rowborough and an updated walking and cycling plan due in the first half of 2027. Wichel Way, the new road under the M4 into Wichelstowe, opened on 26 October 2026.

Last updated: 10 November 2026

Verified: 16 April 2026

Share

This page lists transport schemes that Swindon Borough Council or the government has published. It was checked against their pages on 10 November 2026. Plans change, so follow the links for the latest position.

Recently opened

  • Wichel Way: the new road into Wichelstowe opened on 26 October 2026. It runs through an underpass beneath the M4, east of junction 16, and links Hay Lane and Wharf Road with the Wichelstowe development. It is a two-way, single-carriageway road, and the scheme includes a walking and cycling route under the motorway. The scheme, formally the Wichelstowe Southern Access, had £22.9 million from the Department for Transport and £5.8 million from the council. See our story
  • Fleming Way: the £33 million bus interchange between the railway station and the town centre opened at the end of August 2025. See where Swindon's buses stop now

New Eastern Villages

The New Eastern Villages development will provide 8,000 homes east of the A419. The council says more than £80 million is being invested in roads for it. Work at White Hart, Gablecross, Nythe, Piccadilly and Greenbridge junctions is finished. Still to come:

  • Southern Connector Road: a 1.5-mile, single-carriageway road linking the New Eastern Villages with Commonhead roundabout, near the Great Western Hospital. The main contractor, Buckingham Group, went into administration. The council has surveyed the unfinished work and is designing what remains. It says it will publish new timescales when the designs are complete
  • Eastern access from the A420 at Rowborough: a new road is planned under the railway near Acorn Bridge
  • A420 walking and cycling crossing: a new crossing between the A420 and the New Eastern Villages is being considered, and options are being investigated
  • New South Marston footbridge: the council intends to add ramps as nearby housing is built. A first feasibility study is done and a consultation on design options is to follow

Walking and cycling

The council adopted its first Local Cycling and Walking Infrastructure Plan in 2022. It identified 23 possible schemes, covering routes through the town centre, links to new development areas and links to Highworth and Wroughton.

  • Update: a draft update went out to consultation in winter 2025 to 2026. It raised the number of proposed schemes from 23 to 25
  • Next step: the council plans to adopt the updated plan in the first half of 2027

See cycling in Swindon for the routes that exist now.

Local Transport Plan

The council's Local Transport Plan 4 sets out its transport policies to 2036. The policy and strategy document was updated in 2022 after public consultation. The council says it is developing the implementation plan alongside the emerging Local Plan. The final consultation on the Local Plan 2043 has a deadline of 12 November 2026.

Buses

  • Enhanced Partnership: the council has given notice that it intends to vary the Swindon Enhanced Partnership Plan and Scheme for buses, published in August 2023, to take in the requirements of the Bus Services Act 2025. The partnership is the agreement between the council and bus operators on improving services
  • Wichelstowe bus corridor: the road changes for the quality bus corridor between Wichelstowe and the town centre are built. The council's page describes the bus priority measures at Wootton Bassett Road and Penzance Drive as still to become fully operational

More in our bus services guide.

Trains

Great Western Railway's services are due to transfer into public ownership on 13 December 2026, according to the government's public ownership programme page. See train services from Swindon.

Road cameras

A 12-month trial of automatic number plate recognition cameras at five places in Swindon began in November 2026, to collect speed and traffic data. The council says it will review the results before deciding on any next steps. See our story.

Electric vehicles

For what exists today and the government's chargepoint grants, which run until 31 March 2027, see electric vehicle charging in Swindon.

Updated 10 November 2026: this page was rewritten from council and government pages. The old page said Wichelstowe was south of the M4 and that the Southern Connector Road was complete and served Wichelstowe. Wichelstowe is north of the motorway, and the Southern Connector Road is an unfinished road for the New Eastern Villages. We removed bus rapid transit, cycle superhighways on Drove Road and Fleming Way, e-bike hire, wider 20mph zones, lamp-post charging and rapid charging hubs, and a population target of 250,000, because we found no published plan for them.

Sources: Swindon Borough Council pages on New Eastern Villages highway schemes, the Southern Connector Road, Wichel Way opening, Fleming Way, the Local Transport Plan, the walking and cycling plan and bus corridor, public transport and the road camera trial, and GOV.UK, Great British Railways and the public ownership programme. Checked 10 November 2026.