Skip to content
Transport

Getting a dropped kerb (vehicle crossing) in Swindon

To build a dropped kerb in Swindon you need a vehicle crossing licence from Swindon Borough Council. Your driveway must be at least 5m long and 2.5m wide, and an approved contractor must do the work. The licence costs £203 for a home or £304 for a commercial property.

Last updated: 8 November 2026

Share

A vehicle crossing, often called a dropped kerb, is a lowered kerb that lets a vehicle cross the pavement onto a driveway. You need a licence from Swindon Borough Council to build one outside a home or a commercial property. You also need to check whether you need planning permission, make sure your driveway meets the council's standards, and use a contractor from its approved list.

Check whether you need planning permission

You need planning permission before the contractor starts if:

  • your property is split into flats
  • it is in a conservation area and you would have to remove a gate pillar, wall or fence over one metre high
  • the parking area needs structural work
  • the crossing would be on an A, B or C class road

If a crossing is built without the planning permission it needs, the council will issue an enforcement notice. It may also refuse a crossing on road safety grounds, for example:

  • not enough visibility of oncoming traffic
  • a bend, junction or nearby traffic lights
  • not enough space for a vehicle
  • a lamp post or other street furniture (post box, road sign, bench) in the way
  • a steep slope between the property and the road

Driveway standards

  • Size: at least 5 metres long, measured from the edge of the pavement nearest the driveway to the edge of the property, and at least 2.5 metres wide.
  • Surface: porous asphalt, porous concrete blocks, or concrete or clay block permeable paving, laid on a sub-base such as 4/20 or Type 3. If the driveway is loose gravel, the first metre from the road must be hard standing so stones do not spill onto the highway.
  • Drainage: suitable drainage across the boundary where the driveway meets the highway, to stop surface water running onto the road.

Contractors

The work must be done by a contractor from the council's approved list, published on its page (eight firms on 8 November 2026). Get quotes, then submit your application with the confirmed contractor's details; without them it cannot be processed. The contractor must also:

  • work to the HAUC specification
  • be qualified under the New Roads and Street Works Act (HAUC scheme)
  • hold a licence to excavate the highway (sometimes called a Section 171 notice)
  • read the council's vehicle crossing licence policy

Ask to see evidence of the excavation licence before work starts. It is your responsibility: if the crossing is built without it, the council cannot give you evidence that your crossing is legal. Work done under the licence is covered by the contractor for a two-year maintenance period.

Fee and timescale

  • £203 for a residential property
  • £304 for a commercial property

The application fee is non-refundable. Apply online, then pay straight away using the reference number the council gives you. The council only processes the application once it has received payment. After the licence is confirmed, the work must be finished within 12 months, or you will have to apply again.

If you are after on-street parking rather than a driveway, see residential parking permits in Swindon.

Sources

Checked against these sources on 8 November 2026.

Share

Spot something wrong? Suggest a correction

Related Guides