Do I need planning permission for solar panels in Swindon?
Generally not. Swindon Borough Council says the installation of solar panels will generally not need planning permission, but there are circumstances where planning permission, listed building consent or both are required first.
Where in Swindon is permission always needed?
The council names three cases.
- Swindon Railway Village. An Article 4 Direction applies, which the council says means planning permission is required to install solar panels.
- Bishopstone Conservation Area. The same applies under the Bishopstone Article 4 Direction.
- Listed buildings. Planning permission and listed building consent are both required.
When does an ordinary house need permission?
The council says you need to apply if any of these is true:
- the equipment would stick out more than 0.2 metres beyond the plane of the wall or roof slope
- the highest part of the equipment would be higher than the highest part of the roof, not counting any chimney
- it would be installed on a wall that fronts a highway in a conservation area or a World Heritage Site
- the site is a scheduled monument
- it would be on a building within the grounds of a listed building
Two conditions apply even where permission is not needed. The equipment must be sited, so far as practicable, to minimise its effect on the appearance of the building and the amenity of the area, and it must be removed as soon as practicable when no longer needed.
What is Solar Together?
Solar Together is a group-buying scheme for solar panels and battery storage. Swindon Borough Council and Wiltshire Council run it with iChoosr, which the council describes as an independent group-buying specialist.
The council says that to date over 600 Swindon households have bought solar panel systems through the scheme, with the majority also choosing a storage battery.
Who can register for Solar Together?
The council says registration is open to:
- all Swindon residents, and those in wider Wiltshire, who own their own house or have the landlord's permission to install solar panels
- small and medium-sized enterprises
- Commonhold Associations that meet the same requirement
Registering is free and carries no obligation to go further.
When can I sign up?
Check the Solar Together website. The council's page says registration for the 2025 round closed on 8 August 2025, and tells residents to check the Solar Together website to find out when they can next register an interest. The council's page did not give a later round when we read it on 20 November 2026.
Where can I check whether panels would pay for themselves?
The council points to the Energy Saving Trust, which it says has produced a guide to solar panels and a search-by-postcode tool for estimating the bill savings and payments you could receive.
More from Swindo: Help with energy bills in Swindon, Conservation areas in Swindon, Listed buildings in Swindon.