The Spectrum Building is the yellow, cable-stayed steel building in Swindon that was built for the French car maker Renault. It was designed by the British architect Norman Foster of Foster Associates, opened in 1982, and was known for its first two decades as the Renault Distribution Centre.
Who built the Spectrum Building, and when?
Renault commissioned the building in 1980 after outgrowing its premises in Reading. The dates given for the project are:
- June 1981: planning permission granted
- July 1981: construction started
- December 1982: practical completion
- 1983: official opening by the French Minister of Consumer Affairs, Catherine Lalumière
Why is it yellow?
The yellow is Renault's own colour, used on all the structural elements so the building itself carried the company's identity.
The structure is a cable-stayed steel system. It gives a column-free zone of 24 metres, with columns only 450mm in diameter. The same roof covers both the warehouse and the offices, which was meant as a statement on industrial relations: no distinction between white-collar and blue-collar workers.
Did it win awards?
Yes. In 1984 it won the British Constructional Steelwork Association's Structural Steel Award, a Civic Trust Award and a Financial Times "Architecture at Work" award.
In the same period it also won Private Eye's Sir Hugh Casson Award for the worst new building of the year.
Which James Bond film was it in?
The building featured in A View to a Kill, released in 1985.
Is it a listed building?
Yes. It was listed at Grade II* in 2013. That is the second-highest grade of listing.
What happened after Renault left?
Renault ended its operations in Swindon and closed the facility in 2001. Since then it has been known as the Spectrum Building.
- In late 2023 it was reported that the building would have a £4.7 million renovation, funded by AEW Capital Management.
- In September 2025 the Defence Secretary, John Healey, announced that the site would be converted into a factory making unmanned aircraft (drones), operated by the Portuguese company Tekever and expected to open in 2026. The 254,000 square foot site is planned to hold research and development offices and a full production line.
Where is it?
The building is on the Rivermead Industrial Estate in Westlea, West Swindon. It was built as a commercial distribution centre, not as a visitor attraction.
More from Swindo: listed buildings in Swindon and Swindon in popular culture.
Sources: Wikipedia: The Spectrum Building.
Spot something wrong? Suggest a correction