This page covers the large developments that Swindon Borough Council or the developer has published details for. Plans and dates change, so follow the links to the source for the latest position.
The Local Plan
The council is preparing a new Swindon Local Plan to guide development across the borough to 2043. When it is adopted it will replace the current Swindon Local Plan 2026. The plan sets out how many homes and how much employment land are needed, where development should go, and the roads and other infrastructure to support it.
The plan is at its Regulation 19 publication stage, the last chance to comment before it goes to the Secretary of State for independent examination. Comments close at 11.59pm on Thursday 12 November 2026. See our report on the consultation.
New Eastern Villages
The New Eastern Villages (NEV) is the largest planned development in Swindon. The council calls it one of the largest greenfield developments in the country.
- Homes: 8,000, with new schools, workplaces and community facilities
- Where: east of the A419, covering an expected 724 hectares. Its eastern boundary reaches the point where the River Cole meets the A420
- Villages: Great Stall East, Great Stall West, Foxbridge, Upper Lotmead, Lotmead, Lower Lotmead, Redlands and Rowborough, plus an expansion of South Marston with 500 homes
- District centre: in Great Stall West, just south of the A420 and next to the A419, with shops, leisure and health facilities
- Schools: an education campus for primary, secondary and 16 to 18 education is planned at Great Stall East, with primary schools in other villages
- Jobs: Symmetry Park, in Great Stall West, is the main employment area, with about 30 hectares for storage and distribution
- Other facilities: a GP surgery, a library, a nature reserve, playing fields and allotments
Roads for the New Eastern Villages
The council says more than £80 million is being invested in roads to support the development.
- White Hart junction: finished in May 2022 at a cost of £30.3 million, with a new northbound slip road onto the A419 and a new bridge over the railway
- Gablecross junction: finished in May 2022, £8.4 million
- Nythe junction and Piccadilly roundabout: finished in July 2022, £7.3 million
- Greenbridge roundabout: finished in February 2017, £5.3 million
- Southern Connector Road: a new 1.5-mile single carriageway linking the villages with Commonhead roundabout, near Great Western Hospital. The main contractor, Buckingham Group, went into administration. The council says it has designed the remaining work and will publish updated timescales
- Planned: a new road under the railway near Acorn Bridge, giving access from the A420 at Rowborough
Wichelstowe
Wichelstowe is on the south side of Swindon, next to the M4. Its website says over 4,000 new homes are planned. The Canalside area has the shops and places to eat, including Swindon's Waitrose on Mill Lane. The area has two primary schools and a secondary school, The Deanery CofE Academy. See our Wichelstowe guide.
Kimmerfields and the station area
Kimmerfields is a 20-acre former industrial site in the town centre, next to Zurich's Unity Place offices, which were completed in October 2022. The council has owned the whole site since March 2021.
- Site works: since July 2022 the council has been removing four redundant oil tanks and putting in drainage, utilities, roads, pavements and lighting. It puts the investment at £16.5 million, including £7.5 million from the government
- Masterplan: up to 250 town centre homes, 200,000 square feet of office space, a new green public space and a cultural quarter
- Swindon Knowledge Central: a separate council project to turn the area around the railway station into a district for homes, education, business and research
Fleming Way and the old bus station site
The £33 million rebuilding of Fleming Way is finished. The new bus interchange opened on 30 August 2025 and demolition of the old bus station began on 5 January 2026.
The council wants a new entertainment venue on the former bus station site, for between 1,200 and 2,000 people. The government has pledged £20 million, subject to a business case, which is due to go to the council's Cabinet in February 2027. See our town centre guide and news report.
Regent Circus
The 2014 leisure complex lost almost all its tenants and was mostly demolished in 2026, leaving only Nando's. Its owner, MCR Property Group, expects to submit redevelopment plans in 2026 (Swindon Advertiser). See Regent Circus.
Heritage buildings
- Health Hydro: work to restore the Grade II* listed building on Milton Road is being done in phases. The first phase is complete and the building reopened in January 2026. The council put in £1.5 million and £5 million came from Town Deal funding
- Carriage Works: the council is restoring the Grade II listed Carriage Works to support local jobs and enterprise
- Railway Village: the Swindon Heritage Action Zone aims to protect the Railway Village and link it better with the town centre
- Oasis Leisure Centre: closed since 18 November 2020. In 2025 a developer was given permission to refurbish it, keeping the pool and its listed dome. No reopening date has been set. See the Oasis story
Former Honda site, South Marston
Car production at Honda's plant ended on 30 July 2021. Honda agreed to sell the 370-acre site to Panattoni, a developer of industrial and logistics buildings, which said it would invest over £700 million. Demolition of the car plant began in March 2024. The site is for employment, not housing, and it is not part of the New Eastern Villages. See the Honda factory story.
Other proposals
- Twelve Oaks, Highworth: Gleeson Land has said it will apply for outline permission for up to 520 homes on the former golf course. See our report
- Great Western Hospital: the hospital's Way Forward Programme covers several projects to develop the hospital site
Check a scheme yourself
Updated 10 November 2026: this page was rewritten from the sources below. An earlier version described the Honda site as a housing-led scheme, named Barratt Homes as Wichelstowe's developer, treated the Fleming Way works and the bus station as still to come, and listed the M4 smart motorway east of Reading. We removed these, along with general commentary that had no source.
Sources: Swindon Borough Council pages on the new Local Plan, the New Eastern Villages, NEV development areas, NEV highway schemes, the Southern Connector Road, Kimmerfields, town centre regeneration, the Health Hydro and Great Western Hospital; Wichelstowe; Panattoni. Fleming Way, Regent Circus, Oasis and Honda details are from Swindo's guides to each, checked the same day. Checked 10 November 2026.
Spot something wrong? Suggest a correction